LOTO Course Module – II
Module 2: LOTO Procedures
2.1 Steps in the LOTO Process:
This section details the step-by-step process of implementing LOTO, including:
Preparation for Shutdown: Identifying the energy sources, equipment, and hazards.
Notification of Affected Employees: Informing all personnel who may be affected by the LOTO process.
Equipment Shutdown: Following the established shutdown procedures for the specific equipment.
Energy Isolation: Isolating the equipment from all energy sources using appropriate energy isolating devices.
Lockout/Tagout Application: Applying locks and tags to the energy isolating devices.
Verification of Isolation: Testing to ensure that the equipment is completely de-energized and isolated.
Performing Work: Completing the necessary maintenance or servicing work.
Removal of Lockout/Tagout: Following a specific procedure for removing locks and tags, including verification and notification.
Restoring Equipment to Service: Returning the equipment to its normal operating state.
2.2 Lockout Devices and Tags:
This section covers the different types of locks and tags used in LOTO, their specifications, and proper usage. It emphasizes the importance of using standardized, durable, and easily identifiable devices.
2.3 Group Lockout:
This section explains the procedures for group lockout situations, where multiple workers are involved in the maintenance or servicing activity. It typically involves the use of a group lockbox or hasp.
2.4 Specific Energy Control Procedures:
This section may delve into specific procedures for controlling different types of energy, such as electrical, hydraulic, and pneumatic energy.
Learning Summary:
This module provided a detailed overview of the LOTO procedure, including the various steps involved, the types of devices used, and specific considerations for group lockout and different energy sources.